BLD-Final | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Tell Riley
|
|
|
I would like to meet you onsite to review.
Dana McCarter ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse//final ok see notes below//add second microwave that is in an accessible location or lower the one onsite//letter from architect needs to be submitted and added to documents for project//
|
FIRE-Final Inspection | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
I would like to meet you onsite.
Thanks, Dana Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
FIRE-Final Inspection | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to sign off when the project related fire alarm permit is finaled.
I would like to meet onsite to review any corrections if need be.
Thanks, Dana McCarter ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Conference | 4/29/2020 | 4/30/2020 | 4/30/2020 | P | DONE |
Tell Riley
|
|
|
meet Drew ###-####//discuss med gas room, need architect to approve as built design, 2x6 wall does not extend to underside of roof deck, although shaft is lined with 2 layers 5/8 typ X, walls below are 2x6 with 5/8 type x on both sides//does not match plans//
|
BLD-Ceiling Grid Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Tell Riley
|
|
|
I would like to meet you onsite to review any correction if need be.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-####
Phone #: ###-#### Inspection requested via web by Drew Moorhouse// fix insulation above exam area//add clips to wall connections in back room, other wise ok to cover grid//will meet Drew thursday regarding med gas room and fire wall//
|
BLD-Framing/Rough-in | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Drew Moorhouse//wall cover only//do not cover med gas room, or area needing sprinklers moved//
|
BLD-Conference | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | DONE |
Tell Riley
|
|
|
We would like to meet onsite at 10AM Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Conference | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | DONE |
Tell Riley
|
|
|
requested by Mech inspector to look at med gas room//CN posted for contractor to contact me for conference regarding med gas room ratings and construction//
|
BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | NR |
Brandon Shaw
|
|
|
Need grades...
|