BLD-Energy code compliance | 7/6/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Tell Riley
|
|
|
ok when insulation is installed back in areas that were opened up//
|
BLD-Framing/Rough-in | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//CN posted for minor framing corrections noted on plans and truss docs//ok to insulate only//
|
BLD-Framing/Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need mechanical rough in completed prior to framing inspection//let Mark know//
|
BLD-Wall Bracing | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Foundation | 5/13/2020 | 5/19/2020 | 5/19/2020 | P | PART |
Tell Riley
|
|
|
Mark pour time at 1:30 Phone #: ###-####//WIP//
|
BLD-Footing | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | PART |
Tell Riley
|
|
|
Screened-pour time is at 2pm-Mark Phone #: ###-####//talked with Sue at zoning, verified minumum setback is 20 feet from front pin to garage//setbacks per plans, and minimum per zoning in front//need to delete rebar note from plans as general does not want it installed//
|