Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberELE18-02313
StatusFinaled
Name PRIORITY ELECTRIC
Site Address 3536 W HILL RD
Project Name 
Customer Number 
ePlanReviewNo
Description
New: New gym and cafeteria building for school.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/23/20194/24/20194/24/2019APASS
DetailsMark Moncarr
We need an electrical final for the gym, locker room area please. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final Gym and cafeteria.
Electrical Rough-In3/27/20193/27/20193/27/2019PPASS
DetailsMark Moncarr
We need a ceiling cover inspection for the locker room corridor please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover locker room corridor S side of gym.
Final3/19/20193/20/20193/20/2019PPART
DetailsMark Moncarr
We need a final inspection for the kitchen and commons areas please. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Partial on kitch, and commons area. Construction still going on in gym and locker rooms. Signs to be placed on locked doors not allowing access to non-construction personnel.
Electrical Rough-In3/13/20193/14/20193/14/2019APASS
DetailsMark Moncarr
Kim Phone #: ###-#### Ok cover ceilings in kitch, vestibule, and space under mezzanine.
Electrical Rough-In2/14/20192/14/20192/14/2019APASS
DetailsMark Moncarr
We need a ceiling cover and wall cover inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover hard lid in bathroom areas NE corner, and short wall on W side to right before hallway entrance.
Electrical Rough-In2/4/20192/5/20192/5/2019APASS
DetailsMark Moncarr
We need a cover inspection for the mezzanine area, dishwasher area, and restroom entry ceiling. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover S wall kitch, 2 cans outside bathrooms, and mezzanine.
Electrical Rough-In12/11/201812/11/201812/11/2018PPASS
DetailsMark Moncarr
We need a ceiling cover inspection for the locker rooms Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover ceilings in boys and girls locker rooms.
Permanent Service12/11/201812/11/201812/11/2018PPASS
DetailsMark Moncarr
We need a service inspection for the hillside junior high. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins p/s u/g n ok.
Conference10/17/201810/17/201810/17/2018PDONE
DetailsMark Moncarr
We need a consult for rough in for the gym area. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Discussed conduits runs below corrugated ceiling, clearances from.
Electrical Rough-In9/10/20189/11/20189/11/2018PPASS
DetailsMark Moncarr
We need a masonary wall cover inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover outlets in kitchen area.
Electrical Rough-In8/28/20188/28/20188/28/2018PPASS
DetailsMark Moncarr
We need a block wall inspection. Please, thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover outside walls for N side locker rm, and E side janitors closet and storage.
Electrical Rough-In8/8/20188/10/20188/10/2018PPASS
DetailsMark Moncarr
We would like a light pole base inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover light poles S side of school.
Electrical Rough-In8/8/20188/9/20188/9/2018PPASS
DetailsMark Moncarr
We would like a light pole base inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 3 lts. E side of front parking lot.
Electrical Rough-In8/7/20188/8/20188/8/2018PPASS
DetailsMark Moncarr
We would like a light pole base inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 3 lt poles E side.
Electrical Rough-In8/7/20188/7/20188/7/2018PPASS
DetailsMark Moncarr
We need an underground cover inspection on the east side of the project please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 4-4" on secondary side of trans to new construction of school gym.
Electrical Rough-In8/3/20188/3/20188/3/2018APASS
DetailsMark Moncarr
Poles and pad Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 4 li poles W side, and kitchen/cafeteria floor N side of school.
Electrical Rough-In7/27/20187/30/20187/30/2018APASS
DetailsMark Moncarr
block and cover Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover grd work E side pole lights and E side gym floor. Conduit and masonary boxes installed in walls.
Electrical Rough-In7/17/20187/18/20187/18/2018APASS
DetailsMark Moncarr
Underground Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover grd work for parking lot lights E and W side.
Electrical Rough-In7/11/20187/12/20187/12/2018APASS
DetailsMark Moncarr
We need a partial underground inspection please. Thank you, Kim. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 1" for parking lot lights on S and W side of school.
Electrical Rough-In7/5/20187/5/20187/5/2018PPASS
DetailsMark Moncarr
Ufer Ground Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover ufer E side of building.
Electrical Rough-In6/28/20186/29/20186/29/2018ACANC
DetailsMark Moncarr
We need a pole base inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Talked to electrical contractor. Tom Marshall with Public Works has done light pole inspection.