Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Tom Saunders
|
|
|
final Phone #: ###-#### Inspection requested via web by Debby Pierce...job complete...ok to final
|
Electrical Rough-In | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
James Ady
|
|
|
exterior Phone #: ###-#### Inspection requested via web by Debby Pierce exterior lighting and receps including parking lot
|
Electrical Rough-In | 8/19/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Tom Saunders
|
|
|
roof Phone #: ###-#### Inspection requested via web by Debby Pierce.... 3 mini split units need fuses down sized to 20A...check future inspection
|
Electrical Rough-In | 8/17/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Tom Saunders
|
|
|
2nd floor west side Phone #: ###-#### Inspection requested via web by Debby Pierce... TCO 2nd floor and vestibule...marked on mini plan print
|
Electrical Rough-In | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Tom Saunders
|
|
|
CHAPEL , ENTRY VESTIBULE AND LOBBY Phone #: ###-#### Inspection requested via web by Debby Pierce... chapel only...ok to final for furniture
|
Electrical Rough-In | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
James Ady
|
|
|
2nd floor south east wing Phone #: ###-#### Inspection requested via web by Debby Pierce 314.20 Spark rings needed in Restroom tile. (Add-a-depths) Made a call to 363 to confirm requirment. . Area marked on print minus IT room ok to final.
|
Electrical Rough-In | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Rock A. Hudson
|
|
|
2nd floor north wing Phone #: ###-#### Inspection requested via web by Debby Pierce Discussed disconnecting means for kitchen multi-pole appliances disconnecting means. As per 422.31(A)and(B) where circuit breaker is located with in sight of or is lockable in accordance with 110.25. Level 2 north wing as noted on contractor print TCO ok for furniture.
|
Electrical Rough-In | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Tom Saunders
|
|
|
1st. floor administrative area Phone #: ###-#### Inspection requested via web by Debby Pierce...
admin areas marked on contractor's plan copies ok for temp occupency to move furniture in
|
Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Tom Saunders
|
|
|
east lobby ceiling inspection Phone #: ###-#### Inspection requested via web by Debby Pierce... grid ok to cover
|
Electrical Rough-In | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Tom Saunders
|
|
|
2nd. floor ceiling inspection Phone #: ###-#### Inspection requested via web by Debby Pierce... 2nd floor grid complete..ok to cover
|
Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Tom Saunders
|
|
|
ceiling inspection 1st. floor corridor and chapel. Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to cover
|
Electrical Rough-In | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Tom Saunders
|
|
|
1st. floor ceiling inspection Phone #: ###-#### Inspection requested via web by Debby Pierce... ok to cover ceiling grid 1st floor excluding Chapel and main corridors
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Tom Saunders
|
|
|
2nd. floor hard lid inspection Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to cover
|
Electrical Rough-In | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Tom Saunders
|
|
|
2nd. floor south wall rough in. Phone #: ###-#### Inspection requested via web by Debby Pierce... wall cover south walls 2nd floor ok discussed piping above panels and sprinklers in electrical rm main switch gear
|
Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Tom Saunders
|
|
|
hard lid ceiling and soffits at chapel. 2nd floor north wing wall rough in. Phone #: ###-#### Inspection requested via web by Debby Pierce... rough ok to cover...areas stated above and pony wall and comm area in chapel
|
Electrical Rough-In | 2/22/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
James Ady
|
|
|
hard lid ceilings 1st floor Phone #: ###-#### Inspection requested via web by Debby Pierce All 1st floor Restroom hardlids only ok to cover
|
Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Tom Saunders
|
|
|
rough in inspection 1st. floor administration area Phone #: ###-#### Inspection requested via web by Debby Pierce...walls ok to cover
|
Electrical Rough-In | 2/5/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Tom Saunders
|
|
|
rough in inspection pre-school area and chapel. Phone #: ###-#### Inspection requested via web by Debby Pierce... wall cover for preschool classrooms downstairs and perimeter walls in chapel...marked on plans
|
Conference | 11/30/2018 | 12/4/2018 | 12/4/2018 | A | PASS |
Tom Saunders
|
|
|
Steve Hook is contact at 208-71-1366. Phone #: ###-#### Inspection requested via web by Debby Pierce... discussed one siding for specific areas ok to one side 4ft down for ducting and piping as needed..discussed one siding of future areas and future conferences scheduled for those areas
|
Electrical Rough-In | 8/29/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Tom Saunders
|
|
|
underground....west side branch homeruns...ok to cover
|