Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Ryan Mrachek Phone #: ###-#### Inspection requested via web by Deb Gooden No card posted. Final ok
|
Electrical Rough-In | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Ryan Mrachek Phone #: ###-#### Inspection requested via web by Deb Gooden As per notes on building permit a seperate building permit and electrical permit is required for finish out of dwelling unit. Walls and hardlids of dwelling unit rough in ok cover
|
Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Rock A. Hudson
|
|
|
partial final on the office only on site contact Ryan mrachek Phone #: ###-#### Inspection requested via web by Deb Gooden TCO for 2 offices OK.
|
Electrical Rough-In | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Tom Saunders
|
|
|
Contact: Ryan Mracheck Phone #: ###-#### Inspection requested via web by Deb Gooden... ok to cover demising wall up to panel...top and bottom of panel will be fire caulked...wall behind will be furred out
|
Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Rock A. Hudson
|
|
|
Contact: Mike Ennis - wall rough-in please Phone #: ###-#### Inspection requested via web by Deb Gooden Issue with demizing wall fire rating with panel located recessed in it. Suggested surface mounting in end of hall way as possible solution. Rough in ok cover offices and 1 side of demizing wall up to end where panel located.
|
Final | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PART |
Rock A. Hudson
|
|
|
Contact: Rick Badley Phone #: ###-#### Inspection requested via web by Deb Gooden Down storage/shop area. tco ok
|
Electrical Rough-In | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Rock A. Hudson
|
|
|
Contact: Brian Gee. Partial rough-in ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Basement storage receptacles fished in ceiling will be curface mounted. Walls and ceiling rough in ok cover
|