Final | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Eric Story
|
|
|
Will be open, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn Occ card signed Final ok
|
Final | 3/19/2020 | 3/20/2020 | 3/19/2020 | A | CANC |
Eric Story
|
|
|
Will be open, thank you! Phone #: ###-#### >> Inspection requested via web by Darryn Coburn Inspection cancelled from web by: Darryn Coburn
|
Electrical Rough-In | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Eric Story
|
|
|
this request is for the 2nd floor, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 2nd floor hot checked in only rooms
|
Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Eric Story
|
|
|
1st and 2nd floor corridor ceiling inspection at Airport hotel. Phone #: ###-#### Inspection requested via web by Darryn Coburn 1st and 2nd floor corridor ok to cover *need cord removed above mini split in laundry areas as it is ran above ceiling
|
Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | CANC |
Eric Story
|
|
|
This request is for the 3rd floor, thank you!! Phone #: ###-#### Inspection requested via web by Darryn Coburn No final at this time
|
Electrical Rough-In | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Eric Story
|
|
|
This request is for the 3rd floor, thank you!! Phone #: ###-#### Inspection requested via web by Darryn Coburn 3rd floor hot checked out
|
Final | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | CANC |
Eric Story
|
|
|
This request is for a final inspection for the 4th floor. Will be open, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn No final at this time
|
Electrical Rough-In | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Eric Story
|
|
|
This request is for a final inspection for the 4th floor. Will be open, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 4th floor hot checked-no furniture allowed as stated in a fowarded e-mail from fire marshall until fire supression system in operational
|
Final | 2/6/2020 | 2/7/2020 | 2/6/2020 | A | CANC |
Eric Story
|
|
|
Will be open Phone #: ###-#### >> Inspection requested via web by Darryn Coburn Inspection cancelled from web by: Darryn Coburn
|
Electrical Rough-In | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
Eric Story
|
|
|
This request is for a ceiling inspection for level 3 and 4, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 3rd and 4th floor corridors suspended ceiling ok to cover
|
Electrical Rough-In | 1/21/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Eric Story
|
|
|
this request is for a ceiling inspection for the first floor corridor, lobby and hallways. thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 1st floor hard lids in corridor and lobby area ok to cover
|
Electrical Rough-In | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Eric Story
|
|
|
This request is for the first floor ceiling cover for the dwelling units. Phone #: ###-#### Inspection requested via web by Darryn Coburn 1st floor units ceilings ok to cover@entry awning cans ok to cover
|
Electrical Rough-In | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Eric Story
|
|
|
This request is for the second floor corridor ceiling inspection, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 2nd Floor corridor hard lids only ok to cover
|
Electrical Rough-In | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Eric Story
|
|
|
This request is for an inspection of the 3rd floor corridor. Please call jerry with any questions ###-#### Phone #: ###-#### Inspection requested via web by Darryn Coburn 3rd floor hard lids in corridor ok to cover
|
Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Eric Story
|
|
|
Please inspect re-wiring of storage room ceiling on 4th Floor. Jerry is on site. ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 4th floor storage room ceiling ok to cover
|
Permanent Service | 10/28/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Eric Story
|
|
|
Please inspect the main service Phone #: ###-#### Inspection requested via web by Darryn Coburn AFC rating from IDPCO is 49,566 and main is 65K rated p/s u/g n ok
|
Electrical Rough-In | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Eric Story
|
|
|
This request is the the first floor rooms, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn First floor units ok to cover
|
Electrical Rough-In | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Eric Story
|
|
|
This request is for a pole base inspection, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn Light poles on west end ok to pour
|
Electrical Rough-In | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Eric Story
|
|
|
4th floor units for rough-in 4th floor units ok to cover
|
Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Eric Story
|
|
|
The request is for the third floor rooms, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn 3rd floor units ok to cover
|
Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Eric Story
|
|
|
Inspection is for the rough in for the electrical for 2nd floor rooms. Phone #: ###-#### Inspection requested via web by Darryn Coburn 2nd floor units ok to cover
|
Electrical Rough-In | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Eric Story
|
|
|
This request is for an underground inspection for the exterior front of the building. Please call Jerry with any questions ###-#### Phone #: ###-#### Inspection requested via web by Darryn Coburn Front of building on elder ok to cover
|
Electrical Rough-In | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Eric Story
|
|
|
This request is for a partial rough/cover inspection for the common areas and stairwells, Please call Jerry with any questions he will be onsite, ###-#### Phone #: ###-#### Inspection requested via web by Darryn Coburn Comm areas and stairways and halls throughout ok to cover(areas as noted will be one sided)
|
Electrical Rough-In | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Eric Story
|
|
|
This request is for a partial underground inspection Phone #: ###-#### Inspection requested via web by Darryn Coburn U/G on west side and middle ok to cover east still yet to be done at this time
|
Electrical Rough-In | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Eric Story
|
|
|
This request is the an underground inspection in parking lot, please meet Jerry in parking lot. Thank you!! Phone #: ###-#### Inspection requested via web by Darryn Coburn Parking lot and secondaries/inside lobby area were sheetrocking ceiling proir to drop ceiling ok to cover
|
Electrical Rough-In | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Eric Story
|
|
|
This request is for floor outlets in the northwest corner of the slab. Thank You! Phone #: ###-#### Inspection requested via web by Darryn Coburn Floor boxes ok to cover
|
Electrical Rough-In | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Eric Story
|
|
|
this request is for an underground inspection please Phone #: ###-#### Inspection requested via web by Darryn Coburn U/G for inside building all power and data ok to cover
|