Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberELE19-03015
StatusFinaled
Name SALMON ELECTRICAL CONTRACTORS INC
Site Address 401 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Electrical work on Whole Foods Remodel
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/9/20203/9/20203/9/2020PPASS
DetailsRock A. Hudson
Keegan Phone #: ###-#### Final ok
Final3/5/20203/6/20203/6/2020AFAIL
DetailsRock A. Hudson
coffee bar & soup cooler ... call ahead // Keegan Phone #: ###-####
300.15- All wiring to terminate in a box by approved means. Under west display added old circuit cut off about 18" out of conduit and left exposed.
Electrical Rough-In10/25/201910/25/201910/25/2019PPASS
DetailsRock A. Hudson
Later if possible with a half hour notice ..... underground // Keegan Phone #: ###-#### Under slab for soup and hot/cold bars rough in ok cover
Final9/23/20199/23/20199/23/2019PPART
DetailsRock A. Hudson
Permit to remain open for additional work still to complete.
MC whip located at truss level shall terminate in a box as per 300.15.
Open box located above coffee bar shall be covered as per 314.25.
TCO of coffee bar only OK
Electrical Rough-In9/23/20199/23/20199/23/2019PPASS
DetailsRock A. Hudson
Keegan Phone #: ###-####
Cloud rough in.
Electrical Rough-In9/12/20199/13/20199/13/2019APASS
DetailsRock A. Hudson
John Phone #: ###-####
Wall rough in ok cover
Electrical Rough-In9/6/20199/9/20199/9/2019APASS
DetailsRock A. Hudson
ground // John Phone #: ###-####
Low voltage portion of walker duct has been damaged by concrete saw. This section has been abandoned but will be sealed with flex seal to prevent concrete slurry from entering.
Underslab of new coffee bar rough in ok cover