Final | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Rock A. Hudson
|
|
|
Mini cell site inspection Contact Alex Ybarra Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Final | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | FAIL |
Rock A. Hudson
|
|
|
Final inspection for mini cell site. Contact Alex Ybarra Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 250.24- A grounding electrode conductor shall be connected to the grounded conductor at the service main discnnecting means. Grounds and neutrals seperated at time of inspection.
|
Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Rock A. Hudson
|
|
|
Underground Inspection Contact Alex Ybarra Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Under ground rough in ok cover
|
Electrical Rough-In | 9/12/2019 | 9/12/2019 | 9/12/2019 | A | CANC |
Rock A. Hudson
|
|
|
Underground Inspection. Contact Alex Ybarra Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|