Final | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Daryl DeGrange
|
|
|
Received document (lighting controls operation report) the US Attorney Office Final ok
|
Final | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PEND |
Rock A. Hudson
|
|
|
Please call Luke for final inspection of office furniture and for approval of receptacle marking for relay controlled features. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Pending energy commissioning report, rest ok to final.
|
Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | DONE |
Daryl DeGrange
|
|
|
Received Controls Operation Report
|
Final | 2/6/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Rock A. Hudson
|
|
|
Please call Luke for TCO final. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 210.8(B)(1)- All 15 and 20 amp 120 volt receptacle outlets located in bathrooms shall have GFCI protection. Executive bath 1 is 1 is not. 406.3(E)- All non locking-type 125 volt, 15 and 20 amp receptacles that are controlled by an automatic control device for the purpose of energy management or building automation shall be marked with the controlled symbol and the word "controlled". Permenant stamp acceptable. Contractor able to correct without delaying TCO for furniture. TCO for furniture OK
|
Electrical Rough-In | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Eric Story
|
|
|
Please call Luke for ceiling inspection, thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 4th and 5th floors remaining suspended ceilings ok to cover
|
Electrical Rough-In | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please call Luke for part ceiling grid inspection. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Level 5 grid complete except for admin and ADP rm. Grid rough in as noted ok cover
|
Electrical Rough-In | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please call Luke for ceiling cover inspection for 5th floor, partial only. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Explained 2015 energy code that was adopted on 1/1/18 for lighting commissioning report needed. IECC 2015 C408.3.1- Functional testing. Prior to passing final inspection, the registered design professional shall provide evidence that the lighting contrrol systems have been tested to ensure that control hardware and software are calibrated, adfusted, programmed and in proper working condition with the construction documents and manufacturer's instructions. Functional testing shall be in accordance with C408.3.1.1 and C408.3.1.2 for application control type. North and west corridor and office grid on each side rough in ok cover
|
Electrical Rough-In | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call Luke for grid ceiling cover inspection on 5th floor. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo South corridor and offices on both sides grid rough in ok cover
|
Electrical Rough-In | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PART |
Rock A. Hudson
|
|
|
Please call Luke for partial ceiling inspection on 5th floor. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 4-05-23- It shall be unlawful for any person to cover in any way any wiring or equipment without first having the same inspected be an electrical inspector. No future boarders on grid. 110.26- Minimum work clearance shall be provided for HVAC line voltage access panels. East outer offices, south outer and inner offices and corridor grid, storage rm and main copy supply grid rough in ok cover.
|
Electrical Rough-In | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call Luke for 4th floor top of stair and soffit R/I. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Level 5 over stair grid and level 4 conference room soffit rough in ok cover
|
Electrical Rough-In | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Luke for R/I inspection of miscellaneous walls and soffitts. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Level 5 hallway intersection hardlids and level 4 conference room walls rough in ok cover
|
Electrical Rough-In | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call Luke for R/I inspection of hard lids. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo Corridor 4 corners, center south corridor, showers, executive bathroom hardlids rough in ok cover.
|
Electrical Rough-In | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Rock A. Hudson
|
|
|
Please call Luke for wall R/I inspection of phase 3. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phase 3, wall rough in complete. Walls rough in ok cover
|
Electrical Rough-In | 10/15/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Rock A. Hudson
|
|
|
Please call Luke for inspection of phase 2 walls. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo South of elevator to west and west side wall rough in ok cover
|
Electrical Rough-In | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Rock A. Hudson
|
|
|
Wall R/I cover inspection west of elevators. Please call Luke for any questions. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo All walls east of elevator rough in ok cover
|
Conference | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | DONE |
Rock A. Hudson
|
|
|
Please call Luke to discuss top out of plywood and sheetrock in hallways and general installation nature. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed the cover of 1 side of walls, (top out) only. BCC 4-05-23 It shall be unlawful to conceal any wiring or equipment prior to having same inspected by City of Boise Electrical inspector. Contact stated no wiring in areas in question so top out OK
|
Electrical Rough-In | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PART |
Rock A. Hudson
|
|
|
Please call Luke to discuss top out of plywood and sheetrock in hallways and general installation nature. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo One side cover on upper portion of walls only rough in ok cover
|