Permit Information
Permit NumberELE20-00075
StatusFinaled
Name ROBERTSON ELECTRIC
Site Address 101 S ALLUMBAUGH WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Complete wiring of 19,195 square foot Childrens Therapy Place commercial building
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/22/20207/23/20207/23/2020APASS
DetailsTom Saunders
FINAL Phone #: ###-#### Inspection requested via web by Zane Robertson...
job complete...card signed...ok to final
Final7/6/20207/7/20207/7/2020APART
DetailsTom Saunders

Left for final:
hand dryers, pool rm-GFCI protect lighting,panel cover, activity rm ceiling, tree moved/removed infront of service disconnects
Final7/2/20207/6/20207/6/2020APART
DetailsEric Story
final Phone #: ###-#### Inspection requested via web by Zane Robertson
Roof top units and comm room/Elevator cab lights need swapped to 15 amp and need access to pit for inspection
Final7/1/20207/2/20207/2/2020PCANC
DetailsTom Saunders
Phone #: ###-#### >> Inspection requested via web by Zane Robertson Inspection cancelled from web by: Zane Robertson
Final6/30/20207/1/20207/1/2020PPART
DetailsTom Saunders
Downstairs final Phone #: ###-#### Inspection requested via web by Zane Robertson...

OK for final...game rm, activity rm walls, downstairs offices, entry, and reception

For final...rooftop units, low volt rm, exterior recps, bathroom outlets dwnstairs, hand dryers-all baths, pool rm, breakroom, fire riser rm, panel schedules, and parking lot lights

Building still needs sign and elevator inspections...outside contractors scope of work
Final6/29/20206/30/20206/30/2020PPART
DetailsTom Saunders
Upstairs final inspection Phone #: ###-#### Inspection requested via web by Zane Robertson
...
patial final for upstairs...ok
hand dryers will need done by final...safed off
LV rack needs bonded by final
Final6/26/20206/29/20206/29/2020ANR
DetailsDaryl DeGrange
Upstairs final inspection Phone #: ###-#### Inspection requested via web by Zane Robertson Not ready at this time, Hand dyers and dishwasher not installed leaving MC exposed with out being terminated in j-box. GFIC receptacle installed behind refrigertor leaving it not readily accessible. Office area with out power. panel dirtectory for upstairs area not complete.
Electrical Rough-In6/18/20206/19/20206/19/2020APASS
DetailsTom Saunders
First floor above grid inspection. Phone #: ###-#### Inspection requested via web by Zane Robertson..grid ok to cover
Electrical Rough-In6/14/20206/15/20206/15/2020APASS
DetailsTom Saunders
upstairs above grid inspection. Phone #: ###-#### Inspection requested via web by Zane Robertson...2nd floor grid ok to cover
Permanent Service4/16/20204/16/20204/16/2020PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Zane Robertson...
p/s u/g new ok...6 meters needed
Rough-In Permanent Service4/13/20204/13/20204/13/2020PNR
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Zane Robertson...
not ready for service...panels need completion and AFC label required for service...110.9
Electrical Rough-In4/13/20204/13/20204/13/2020PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Zane Robertson...
rough in of walls and hard lids for 1st floor ok...
excluding - service rm, elevator room, and pool panel rm which is someone elses scope of work
Electrical Rough-In4/8/20204/8/20204/8/2020PPASS
DetailsTom Saunders
Soffit inspection Phone #: ###-#### Inspection requested via web by Zane Robertson..

exterior soffits and first entry lid ok to cover
meter pac and exterior service ok...interior panels need made up for service completion...uffer under stairs
discussed LV racking system bonding and main waterline for fire sprinkler system bond
Electrical Rough-In4/6/20204/6/20204/6/2020PPASS
DetailsRock A. Hudson
Rough in for second floor Phone #: ###-#### Inspection requested via web by Zane Robertson
Discussed if medical wiring method needed, tamper requirements, no lighting below 7'6", commissioning report for lighting control system.
Contractor ran medical grade wiring method in all rooms for therapy.
Confirmed city approved set of prints on site.
Level 2 walls and hardlids rough in ok cover.