DOC - Permit Finaled | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Andy J. Long
|
|
|
project inspected under main permit, see ESC15-00504. No violations or corrections needed at site.
|
General Inspection | 10/9/2017 | 10/9/2017 | 10/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Andy J. Long
|
|
|
No trackout from Kensington to Gary Lane or Saxton. See also main site ESC permit, ESC15-00504
|
General Inspection | 8/1/2017 | 8/1/2017 | 8/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/16/2017 | 6/16/2017 | 6/16/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/1/2017 | 5/1/2017 | 5/1/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/14/2017 | 3/14/2017 | 3/16/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2017 | 1/27/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/12/2016 | 12/12/2016 | 12/15/2016 | | PASS |
Andy J. Long
|
|
|
No trackout to Gary or Saxton. Stormwater retained on site. No corrections requested.
|