Site Final | 12/8/2016 | 12/9/2016 | 12/12/2016 | A | PASS |
Andy J. Long
|
|
|
Building in final stages of completion with minor work on interior. RP Tom to remove DI bags on access road this week. Shoulders along road and parking lot have been stabilized as well as open areas around the permanent stormwater retention ponds. No stockpiles or construction materials staged on site.
ESC permit conditions approved. BLD inspector to verify DI bags have been removed.
|
General Inspection | 11/25/2016 | 11/25/2016 | 11/25/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2016 | 10/10/2016 | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Vertical work occruing, entrance to site is now paved. No corrections issued.
|
General Inspection | 7/8/2016 | 7/8/2016 | 7/11/2016 | | PASS |
Evan Jenkins
|
|
|
No issues observed at time of inspection
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/6/2016 | 4/6/2016 | 4/6/2016 | | PASS |
Evan Jenkins
|
|
|
WIP on foundation. No ESC issues observed
|