Site Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Andy J. Long
|
|
|
All temporary BMPs have been removed as requested. ECB below yard has been properly installed and covered with topsoil material. Rock stockpile on adjacent lot has been hauled. ESC permit conditions satisfied. No corrections needed.
|
General Inspection | 5/3/2017 | 5/3/2017 | 5/4/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 4/17/2017 | 4/18/2017 | 4/18/2017 | P | NR |
Andy J. Long
|
|
|
Bill ###-####
Site in good condition. Not ready for ESC final. No violations at site. Site walk through with Bill
Remaining tasks: - pull DI bags on Paso Fino - remove stockpile of excess landscaping rock - have installation of erosion control blanket inspected by ESC divivsion. ECB to be installed on slope between the landscapied portion of yard and the native vegetation that was preserved.
Wattle at limit of disturbance may remain and photodegrade.
Bill to call for re-inspection.
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/31/2017 | P | PASS |
Melissa Jannusch
|
|
|
Sediment is contained. No runoff. Perimeter wattles are ok. Sign is posted. No corrections.
|
Site Preparation | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted with contact information provided. Lined concrete washout pit is onsite for cement work. Perimter sediment control wattles along edge of pavement and back slope. No discharges or spills observed. Clean site with BMPs installed, approved
|