Site Final | 11/8/2017 | 11/8/2017 | 11/9/2017 | P | PASS |
Andy J. Long
|
|
|
HOme complete, landscaped and occupied. No temporary BMPs or loose materials remaining.
|
Aging Inspection | 11/7/2017 | 11/7/2017 | 11/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 9/5/2017 | 9/5/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 7/5/2017 | 7/5/2017 | 7/5/2017 | | PASS |
Andy J. Long
|
|
|
WIP. Frame complete. Yard not yet landscaped. No trackout or discharges.
|
Site Preparation | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Andy J. Long
|
|
|
Bob ###-####
Permit sign posted. Lot has been previously cleared. Wattle installed along curb on 24th, access to site will be through the alley. Approved for construction.
|