Aging Inspection | 11/10/2017 | 11/10/2017 | 11/13/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 9/8/2017 | 9/8/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Melissa Jannusch
|
|
|
Concrete washout has been cleaned out per previous correction request. Correction request: Spoke with Clint (RP) about track out issues due to the heavy precipitation. He has a street sweeper scheduled for Friday.
|
Site Preparation | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
Andy J. Long
|
|
|
Phone #: ###-####
East Valley BMPs (inlet protection, concrete washout, ESC permit signage) installed. SFHs in progress. Approved for excavation
|