Permit Information
Permit NumberESC17-00657
StatusFinaled
Name JOSHUA FOLGER
Site Address 555 S COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Installation of new parking lot and preparation of pads for future buildings on the northwest corner of Intermountaion Gas campus. Perimeter silt fence to be installed at still, construction entrance to prevent trackout to existing paved areas and protect existing stormwater inlets. Fugitive dust control will be required. Site preparation inspection is required. SWPPP with narrative and site map submitted. No eNOI submitted at time of City of Boise Review. Project qualifies for CGP based on area.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/11/20186/11/20186/11/2018PPASS
DetailsAndy J. Long
Grading, utility installation and paving of parking & operations lot is now complete. No loose dirt or construction materials left onsite. Silt fence on south end has been removed and sodded grass is growing well. No temporary BMPs left on site. ESC permit conditions satisfied.
General Inspection4/26/20184/26/20184/26/2018 PASS
DetailsMichael Zawacki
Some small area still need patching. Expected to complete in June.
General Inspection3/6/20183/6/20183/6/2018PPASS
DetailsMichael Zawacki
Area on south needs sod. Contractor bringing in fill material to make elevation for new sidewalk. Verry little disturbed area left.
General Inspection1/2/20181/2/20181/2/2018APASS
DetailsAndy J. Long
WIP on structures within site. No trackout or loose dirt leaving site. No discharges or loose trash issues observed. Permit sign and SWPPP posted.
General Inspection11/29/201711/29/201711/29/2017PPASS
DetailsMichael Zawacki
Majority of paving complete. No loose dirt, trackout, or runoff. Currently working on northern edge of propertry.
General Inspection10/2/201710/17/201710/16/2017PPASS
DetailsMichael Zawacki
Currently laying biaxial grid and building base. All disturbed area is below level of pavement. Excavators are running on parking lot, contractor said they will clean when done, no dirt being tracked onto road. SWPPP and permit are available at entrance
General Inspection9/22/20179/25/201710/2/2017ACANC
DetailsAndy J. Long
Tracking Control10/2/201710/2/201710/2/2017APASS
DetailsAndy J. Long
Trackout has been cleaned up. No new trackout. DI bag installed at White Cloud, nearly 1 mile away (in front of red brick apartments). Will need to check for maintenance and removal.

Permit sign posted. Approved.
Tracking Control9/21/20179/22/20179/22/2017APASS
DetailsAndy J. Long
Follow up to see if trackout is cleaned. approx. 11 AM

DI bag installed on receiving inlet, wheels are now being washed to prevent trackout, and sweeper trucks did operate yesterday on McMullen and within parking lot. Will check on conditions Monday
Site Preparation9/21/20179/21/20179/21/2017PCANC
DetailsAndy J. Long
Tracking Control9/21/20179/21/20179/21/2017AFAIL
DetailsAndy J. Long
Significant trackout from site onto McMullen. No construction entrance installed.

No permit sign posted.

Verbal correction request to clean street. Crew installed construction rock while on site.