General Inspection | 11/16/2018 | 11/16/2018 | 11/19/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Adjacent lot where staging occured is being monitored by the Eyrie Canyon phase 9 & 10 permits. No corrections. Temp BMPs to remain for ongoing construction.
|
General Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 | | PASS |
Michael Zawacki
|
|
|
Completed. OK to final when other permits closed.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/3/2018 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. BLD still open. Wattles installed below disturbed area above and below home. NO discharges or sediment runoff. Approved.
|
General Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 | | PASS |
Andy J. Long
|
|
|
Home is near completion. Site is landscaped. No corrections requested.
|
General Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | | PASS |
Michael Zawacki
|
|
|
Wattle has been placed around edges to prevent run on and run off from irragation.
|
General Inspection | 8/16/2018 | 8/16/2018 | 8/16/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work and landscaping complete. Some small rills starting from irragation water running into lot below. Would install wattle along both lot lines to prevent dirt coming from vacant lot above and water eroding onto vacant lot below.
|
General Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | | PASS |
Andy J. Long
|
|
|
Landscaping in progress. Project near completion. No ESC corrections requested.
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/13/2018 | 7/13/2018 | 7/13/2018 | | PASS |
Michael Zawacki
|
|
|
WIP, no ESC issues. Inspected 7-12
|
General Inspection | 6/28/2018 | 6/28/2018 | 6/29/2018 | | PASS |
Andy J. Long
|
|
|
WIP on exterior finish and interior. Not yet landscaped, disturbed area contained. Hillside vegetation behind home preserved. No corrections requested.
|
General Inspection | 6/13/2018 | 6/13/2018 | 6/13/2018 | | PASS |
Michael Zawacki
|
|
|
Some rilling from water coming off roof line. Site still contained by bark mulch wattles. Stucco washout on site and used. No issues with dirt leaving site.
|
General Inspection | 5/7/2018 | 5/29/2018 | 5/29/2018 | P | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Site is clean and free of ESC issues.
|
General Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Andy J. Long
|
|
|
Permit posted. No sediment runoff observed. Trash contained. Foundation and frame complete.
|
General Inspection | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Site is contained and clean. Talked to foreman and he said they sweep and clean after every work day.
|
Random Inspection | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PASS |
Michael Zawacki
|
|
|
Grading and excavation has begun. Some tracking that looks worse than it is. Perimeter controls intact.
|
Site Preparation | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Michael Zawacki
|
|
|
PJ Smith ###-#### Jill with Ground FX will Be RP. Builder will be proactive to keep neighbors happy.
|