Site Final | 11/6/2018 | 11/8/2018 | 11/9/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/5/2018 | 11/5/2018 | 11/6/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site fInal
|
Site Final | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | NR |
Andy J. Long
|
|
|
Mud in gutter on Pasadena Street needs to be cleaned up ASAP.
Verbarl correction request to RP Jeremy. Follow up scheduled for next week. Storm drain has sediment protection, dry conditions. No other violations.
Need to remove DI bag on Pasedena after cleanup and landscaping is complete.
|
General Inspection | 9/17/2018 | 9/17/2018 | 9/17/2018 | | FAIL |
Michael Zawacki
|
|
|
Lots of mud in gutter on Pasadena. Paint washout has been thrown on dirt and sidewalk. About half of landscaping complete.
|
General Inspection | 7/31/2018 | 7/31/2018 | 8/1/2018 | | PASS |
Michael Zawacki
|
|
|
All buildings are framed and work is on interior. Interior parking lot is paved and gutters conpleted. Some sections of sidewalk along Owyhee need repair. Some loose trash in site, some areas of sidewalk are covered with dirt and pit run.
|
General Inspection | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP on vertical and interiors. Site has had parking lot paved, no workers driving on exposed dirt. Curbing complete around perimeter, most sidewalks done. Site is free from trash.
|
Random Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Curb and gutter now complete, site is contained. Lumber scraps will soon need to be picked up. SWPPP doesn't have an inspection since 4-9
|
General Inspection | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PEND |
Michael Zawacki
|
|
|
Some building material on site that needs to be cleaned and disposed. Currently working on framing and installing curbing on perimeter. Syman SWPPP reports don't seem to be meeting the 14 day set in SWPPP or are not being put in completed inspection section. Rainfall triggered inspections completed, if changing to monthly and rain triggered SWPPP needs to be updated.
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PEND |
Michael Zawacki
|
|
|
Two exits and neither are stabalized. Some trackout, called RP Jeremy and asked for repairs and cleaning. Rest of site is contained and clean, trash was being removed while I was on site.
|