Permit Information
Permit NumberESC17-01003
StatusFinaled
Name JASON MCKENDRICK
Site Address 3970 N GOSHAWK PL
Project Name 
Customer Number 
ePlanReviewNo
Description
New single family. Utilize and maintain subdivision BMPs installed by developer (concrete washout, DI bags), post ESC permit sign, contain all loose trash , prevent/sweep trackout. ESC site map with narrative approved.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/13/20188/13/20188/13/2018PDONE
DetailsMike Jordan
DOC - Permit Finaled8/13/20188/13/20188/13/2018PPASS
DetailsMike Jordan
General Inspection8/1/20188/1/20188/1/2018 PASS
DetailsAndy J. Long
Painting and exterior finish in progress. Fram complete, landscaping not yet installed. No spills, trackout, or discahrges. Trash contained.
General Inspection7/17/20187/17/20187/17/2018PPASS
DetailsAndy J. Long
WIP on interior. Trash contained, no trackout or spills. No corrections requested
General Inspection7/12/20187/12/20187/12/2018 PASS
DetailsMichael Zawacki
Home exterior complete, no gutters yet. Yard is bare, some weeds growing over. No ESC issues.
General Inspection6/26/20186/26/20186/26/2018 PASS
DetailsAndy J. Long
Frame complete. No trackout or discharges from site. Workers parking on street. No corrections requested.

Before site final RP shall check for any windblown trash around the culdesac and clearing limits.
Random Inspection1/29/20181/29/20181/29/2018PPASS
DetailsMichael Zawacki
WIP. Wattle has been installed along sidewalk and sidewalk has been cleaned. Street looks like it was swept.
General Inspection1/19/20181/19/20181/19/2018PCANC
DetailsMichael Zawacki
General Inspection11/7/201711/7/201711/7/2017PPASS
DetailsMichael Zawacki
Perimeter controls in use. No new work since last inspection.
General Inspection10/16/201710/31/201711/2/2017APASS
DetailsMichael Zawacki
Excavation begun. Neighborhood BMPs in place. Front perimeter protected by wattle and gator guard.
Site Preparation10/16/201710/16/201710/16/2017PPASS
DetailsAndy J. Long
Rick ###-####

Onsite pre-construction conference. Subdivision has designated lined washout and storm drain inlet protection already installed.

Work to begin Wednesday, excavator to install rock construction entrance and perimeter wattle. Reviewed regular housekeeping, dust control, and trash containment rules.

Approved for construction