Site Final | 7/1/2019 | 7/1/2019 | 7/2/2019 | P | PASS |
Michael Zawacki
|
|
|
Track utilities currently working on road, BMPs installed are theirs.
|
General Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/29/2019 | 4/29/2019 | 4/30/2019 | | PASS |
Michael Zawacki
|
|
|
Building completed, single lane around perimeter paved. Rest of area is pitrun.
|
General Inspection | 2/26/2019 | 2/26/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
Site is in low spot, no trackout.
|
General Inspection | 12/24/2018 | 12/24/2018 | 12/24/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 | | PART |
Michael Zawacki
|
|
|
Trackout onto cul-de-sac from back entrance. Front rock entrance is compacted. Site is in a hole, no runoff issues.
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/24/2018 | | PASS |
Michael Zawacki
|
|
|
Site graded, foundation in progress. Site has rock construction entrance. Job is located at lowest point in area. Permit displayed at entrance.
|
General Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Michael Zawacki
|
|
|
No site preparation inspection requested....ESC issued with GRD. No work started, nothing staged.
|