Site Final | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 1/13/2020 | 1/13/2020 | 1/13/2020 | | PASS |
Michael Zawacki
|
|
|
No new activity on 3 remaining lots.
|
Aging Inspection | 11/12/2019 | 11/12/2019 | 11/13/2019 | | PASS |
Michael Zawacki
|
|
|
First 3 homes completed. Noa ctivity on half of lot.
|
Aging Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | | PASS |
Michael Zawacki
|
|
|
Home is finished and landscaped. Site still has empty lots and one home under construction. Large pile of trash at site. Tree service is using lot to work in neighbors yard.
|
General Inspection | 7/12/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed, not landscaped.
|
Aging Inspection | 7/11/2019 | 7/11/2019 | 7/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is framed, only workers onsite are inside. No current ESC issues, box truck parked in mud, site has an entrance.
|
General Inspection | 8/7/2018 | 8/23/2018 | 8/24/2018 | A | PART |
Andy J. Long
|
|
|
Permit sign posted, no trackout to Pennsylvania. Foundation has been poured. Lined washout was not utilized.
Correction request: - provide trash containment for framing crew - use concrete washout for next phase.
Clarified that rock/aggregate may be dumped, but the actual washout should be done into a lined container.
Met GC Tony with TK development and discussed corrections. He will get it done, there will 6 units on this site.
|
General Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Andy J. Long
|
|
|
|