Site Final | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Andy J. Long
|
|
|
Townhome near completion. WIP on interior. Front sidewalk and grass median are in good condition.
No ESC corrections needed. Approved.
|
General Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. Permits posted. Clean site.
|
Site Preparation | 11/16/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Andy J. Long
|
|
|
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
|