Permit Information
Permit NumberESC17-01538
StatusFinaled
Name WENDY LARIMORE
Site Address 444 W PARKCENTER BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
(Boise River Greenbelt - Temporary re-location) New path to direct Greenbelt users away from river bank and former path repair. ESC plan submitted, Precision Gradining is operator and City of Boise Parks n Rec project manager is RP. Sediment controls to be installed between work area and River. Use existing stabilized access. Soils may be stockpiled on site per ESC site plan. ESC site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/8/20194/8/20194/10/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled4/10/20194/10/20194/10/2019PPASS
DetailsMichael Zawacki
General Inspection3/7/20193/7/20193/8/2019 CANC
DetailsAndy J. Long
General Inspection2/4/20192/4/20192/4/2019 PEND
DetailsAndy J. Long
parcel currently being utilized for river bank repair staging area as well as the stockpiles that were in the area. See also ESC18-01442
General Inspection1/3/20191/3/20191/4/2019 CANC
DetailsAndy J. Long
General Inspection11/30/201811/30/201811/30/2018 PASS
DetailsAndy J. Long
Stockpiles are allowed onsite for storage. No new activity or development allowed. Area of stockpile storage does not have a discharge point and is below grade of Parkcenter, Greenbelt, and vegetated berm between piles and River. Will continue to monitor.
General Inspection10/29/201810/29/201810/29/2018 PASS
DetailsMichael Zawacki
Greenbelt relocation complete. Old BMPs still stored behind fenced off area. Stockpiles are below surrounding grade and not leaving site.
Complaint Inspection9/28/20189/28/20189/28/2018PPEND
DetailsAndy J. Long
Stockpiling is still occuring at site. Placement is below grade of vegetated berm and GreenBelt path. Will need to get status update on when stockpiling will be complete. No trackout. No dust issues observed.
General Inspection9/11/20189/11/20189/11/2018 PEND
DetailsAndy J. Long
Stockpiling occuring on adajacent lot 400 W Parkcenter. SWO posted on that site.

Temporary path is complete. No activity. No ESC corrections.
General Inspection8/9/20188/9/20188/9/2018APASS
DetailsMichael Zawacki
Area is still fenced off, path detour around pump house complete. Old silt fence still installed, no work occurring.
General Inspection7/17/20187/17/20187/17/2018PPASS
DetailsMichael Zawacki
Greenbelt reroute completed.
Area is being used for staging for horizontal boring, contractor on site removing bushes.
General Inspection6/6/20186/7/20186/7/2018PPASS
DetailsMichael Zawacki
New pathway complete and paved. Old path is still behind a chain link fence. Silt fence still on site, mostly collapsed and failing, can be removed. Site will need need BMPs if old remaining path is to be demoed or site repaired.