General Inspection | 5/31/2019 | 5/31/2019 | 5/31/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Michael Zawacki
|
|
|
Please refer to ESC17-01754
|
General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | | FAIL |
Andy J. Long
|
|
|
No construction entrance. Lots of workers and delivery services driving through mud and puddles on site. Trackout. Washing concrete washwater into the ground
Corrections: - Install construction entrance - install lined washout facility. Post washout sign - sweep Hudson, Targee, and Federal Way SE bound.
SEE ESC17-01754 for follow up inspections
|
General Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 2-26. Site was contained and free of trackout at time of inspection.
|
General Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | | PEND |
Andy J. Long
|
|
|
see ESC17-01764
|
General Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | | CANC |
Andy J. Long
|
|
|
|