General Inspection | 5/1/2019 | 5/1/2019 | 5/2/2019 | | PASS |
Andy J. Long
|
|
|
ESC permit finaled. BMPs to remain for ongoing construction at North Hill. See also ESC15-00853.
|
DOC - Permit Finaled | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 3/14. No new activity.
|
General Inspection | 2/28/2019 | 2/28/2019 | 2/28/2019 | | PASS |
Michael Zawacki
|
|
|
No work on new phases. All current work is interior.
|
General Inspection | 2/11/2019 | 2/11/2019 | 2/12/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior completed, all work inside. No ESC issues on site.
|
General Inspection | 1/24/2019 | 1/24/2019 | 1/24/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. Trackout was cleaned up.
|
General Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2018 | 11/28/2018 | 11/28/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 | | PASS |
Andy J. Long
|
|
|
WIP on 4 units at North HIll Townhomes/Hill Terrace. Storm drains have sediment protection, trash contained, crew onsite sweeping up some trackout onto Hill Terrace.
Review washout requirements with onsite crew man and RP Ron, Site is currently in good condition.
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | | PART |
Michael Zawacki
|
|
|
Working on interiors. Lots of dirt tracked in front of building, needs to be swept.
|