Aging Inspection | 6/18/2019 | 6/18/2019 | 6/19/2019 | | CANC |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/18/2019 | 4/18/2019 | 4/18/2019 | | PASS |
Michael Zawacki
|
|
|
All work completed and stabalized. Wattle is still along creek in rear.
|
Site Final | 2/14/2019 | 2/15/2019 | 2/14/2019 | A | PART |
Andy J. Long
|
|
|
Marcus w/ Kriezenbeck
Construction and landscaping in project scope are complete. West Ada facility management to complete rest of landscaping and stabilization and will then remove temporary BMPs
|
General Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | PASS |
Michael Zawacki
|
|
|
RP notified that project is near completion but will not be landscaped till February or March... Exterior work completed. Wattle and inlet protection still installed.
|
General Inspection | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PART |
Michael Zawacki
|
|
|
Met with foreman and looked at site. Washout is full, scheduled with excavator to come clean out and will replace. Construction entrance needs to be freshened up. Drain inlets are protected, they are sweeping parking lot. All water drains towards job site.
|
Site Preparation | 6/19/2018 | 6/21/2018 | 6/20/2018 | A | PEND |
Michael Zawacki
|
|
|
Wattle and buffer in rear protecting canal. Construction entrance leading to parking lot and sweeper on site. Water truck on site. Inlets in parking lot have witches hats. Job trailer is just being delivered. Do not see permit sign or SWPPP information.
|
Site Preparation | 6/15/2018 | 6/18/2018 | 6/19/2018 | P | FAIL |
Michael Zawacki
|
|
|
Andy Phone #: ###-#### Work has begun with no BMP installation. No permits or SWPPP info on site.
|