Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberESC18-00548
StatusFinaled
Name EDWARD CONNELL
Site Address 2638 S GEKELER LN
Project NameGlinden Place Subdivision
Customer Number 
ePlanReviewNo
Description
Subdivision Development. Install construction entrance with angular rock and lining, protect storm drain inlets @ Fall Street and Gekeler. Control fugitive dust. ESC site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/28/20196/28/20196/28/2019PPASS
DetailsMichael Zawacki
check for DI bags on Gekeler & Fall drive
Site Final6/24/20196/27/20196/28/2019PCANC
DetailsAndy J. Long
General Inspection6/24/20196/24/20196/24/2019 CANC
DetailsAndy J. Long
General Inspection5/6/20195/6/20195/6/2019 PASS
DetailsMichael Zawacki
All homes framed, no active concrete work. Sidewalk is blocked with materials. Homes have their own trash containment. DI still protected in rear cul-de-sac. No ESC issues.
General Inspection3/19/20193/19/20193/19/2019 PASS
DetailsMichael Zawacki
Some building material stored on road and sidewalks. Witches hats will soon need to be maintained.
General Inspection1/31/20191/31/20191/31/2019 FAIL
DetailsMichael Zawacki
Multiple homes by Wood River. Site has lots of mud and mess, multiple locations of dumped washout.
General Inspection10/11/201810/11/201810/11/2018PPART
DetailsMichael Zawacki
Washout has been filled with water from rain. All other neighborhood BMPs in place. Workers parking on street, no trackout.
General Inspection9/25/20189/25/20189/26/2018PPASS
DetailsMichael Zawacki
Few foundations in place, one home being framed. Lined washout on site, will need to be cleaned soon. Neighborhood BMPs in place.
General Inspection7/27/20187/30/20187/30/2018APASS
DetailsMichael Zawacki
Site prep work complete. Road, curb, gutters, and sidewalk all installed. New drain inlets have witches hats. No dirt leaving site.
Tracking Control5/18/20185/18/20185/18/2018PPEND
DetailsMichael Zawacki
trackout complaint received.
Talked with RP Ed. Sweeper on site and will have his guys clean road and keep it clean. Will follow up.
Site Preparation5/14/20185/15/20185/15/2018APEND
DetailsMichael Zawacki
Trackout onto Gekeler. Sweeper attacthment on site, asked them to sweep a few time a day. Inlets on corner of project have no protection. Site has no stabalized entrance. Water is in use, site is dust free.