Site Final | 4/19/2019 | 4/23/2019 | 4/24/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/18/2019 | 4/18/2019 | 4/19/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Shop is completed, driveway poured. Area still needs stabalization and landscaping. No dirt leaving site, no ESC issues.
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Michael Zawacki
|
|
|
Chad Phone #: ###-#### Met with Chad on site. BMPs in place. Went over things to look out for during construction. OK to start.
|