DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/21/20207/21/20207/23/2020PNR
DetailsMichael Zawacki
Sent message to Anthony, Gary, and Kai to remove inlet bags from kimball.
Aging Inspection7/20/20207/20/20207/21/2020 CANC
DetailsAndy J. Long
rescheduled for site final
Aging Inspection5/18/20205/18/20205/18/2020 PASS
DetailsMichael Zawacki
All homes completed and lots landscaped. Site still has Di bags at Cannel Island and a port o pot.
Aging Inspection3/16/20203/16/20203/23/2020 PASS
DetailsAndy J. Long
Homes still in progress on Kimball by Tresidio Homes.

Trash contained, no trackout. Storm drains have sediment bags installed. No discharges or BMP violations observed.
Aging Inspection1/15/20201/15/20201/15/2020 PART
DetailsMichael Zawacki
Some issues before snowfall. Individual lots have been scheduled for follow up, RP notified.
General Inspection11/15/201911/15/201911/15/2019PPASS
DetailsMichael Zawacki
Lots of activity in neighborhood. Tresido is having streets swept. Some material and trailers blocking areas on strret and sidewalk. Homes on south end nearly done and windblown trash picked up. No major issues at time of inspection.
General Inspection10/15/201910/15/201910/15/2019PFAIL
DetailsMichael Zawacki
Lots of windblown trash alonge south east rear of site.
Concrete washout is full.
Waste has been dumped around concrete washout.
Dirt on roads and sidewalks.
Sent message to everyone I have number with a Tresido Homes.
General Inspection9/19/20199/23/20199/23/2019PPASS
DetailsAndy J. Long
Concrete washout installed. Storm drains have sediment protection installed. No trackout out of sub. No spills or discharges observed.
General Inspection8/23/20198/28/20198/30/2019ACANC
DetailsAndy J. Long
Aging Inspection8/21/20198/21/20198/23/2019 CANC
DetailsAndy J. Long
General Inspection6/17/20196/17/20196/17/2019PPASS
DetailsAndy J. Long
Tresidio homes doing all SFHs. Subdivsion now called Maple Creek. No trackout, discharges, loose trash issues at time of inspection.
General Inspection5/31/20195/31/20195/31/2019PPASS
DetailsMichael Zawacki
WIP on a few SFH. Landscapers on site, some dirt on sidewalk. No dirt leaving site, no issues.
General Inspection4/22/20194/22/20194/22/2019PPART
DetailsMichael Zawacki
Sidewalks and gutters can use a light sweeping. Large concrete washout on site. Stucco has been dumped around every home that has had stucco work.
General Inspection3/13/20193/13/20193/13/2019PPART
DetailsMichael Zawacki
SOme tracking on street. Sent message to RP for homes causing issues.
General Inspection2/1/20192/1/20192/1/2019PFAIL
DetailsAndy J. Long
Homebuilder Tresidio not using designated lined washout facility.

corrections issued to Tresidio. No subdivision activity.
General Inspection1/9/20191/9/20191/9/2019PPASS
DetailsMichael Zawacki
No home building activity. All perimeter fences installed, road and sidewalk complete, new drains have inlet protection. No equipment or materials staged on site.
General Inspection12/6/201812/6/201812/6/2018PPASS
DetailsMichael Zawacki
No new activity. Steel perimeter fence is complete, inlets in new road all have inlet protection.
General Inspection11/21/201811/21/201811/21/2018PPASS
DetailsMichael Zawacki
Interior roads and sidewalks complete. Fence crew on site, post for perimeter fence installed. Seperate crew on site working in canal right of way.
General Inspection10/18/201810/18/201810/18/2018PFAIL
DetailsMichael Zawacki
Curbing and sidewalk installed. Roadbed has been prepped. Lots of trackout from both entrances. If road is not installed soon site will need two stabalized crushed rock pads. Kimball needs to be swept.
General Inspection10/1/201810/1/201810/1/2018PPASS
DetailsMichael Zawacki
Site has been rough graded. Sewer and/or water lines have been installed. Some materials being stored in south west corner. No blowing dust or trackout at time of inspection.
General Inspection9/10/20189/10/20189/10/2018PPART
DetailsMichael Zawacki
Site needs stabalized ebtrance and exits at two locations.
Water truck on site, dust is being kept down. Entire site is graded, silt fence protecting canals where there is no natural buffer.
General Inspection8/14/20188/21/20188/21/2018APASS
DetailsAndy J. Long
Site rough grading is complete. No roads or joint trench activity yet. Silt fence BMP is installed along the irrigation canal to the south of site. No trackout to Kiball or windblown dust. Permit sign is posted.
General Inspection8/6/20188/6/20188/6/2018PPASS
DetailsMichael Zawacki
Site is stripped and graded. Water tanke on site, one excavator currently stored. Silt fence is protecting canal on south end. Rock entrance will need to be improved before construction. No blowing dust or track out.
Site Preparation7/17/20187/18/20187/19/2018PPASS
DetailsAndy J. Long
2 PM John ###-####

Onsite meeting and walk through with RP John. ESC permit sign and SWPPP info board is posted at entrance. Existing gravel/dirt access through parcel will have addition construction rock installed by excavator when they start grading next week.

Silt fence is installed along the Farmer's Lateral canal, in addition there is a 30 ft easement along canal which will also serve as a buffer. Storm drain sediment bag installed in DI on Kendall at project entrance. Requested that dust control be a priority during grading and hauling work.

Flat lot. Previous homes have been demolished, some tree removal is on going.

Approved for construction.