Site Final | 9/26/2018 | 9/26/2018 | 9/27/2018 | P | PASS |
Andy J. Long
|
|
|
site is final. Mike inspected the project yesterday and contact me. He said the only thing left was an excavator but everything else was gone and no construction.Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Staging area cleaned up, no loose dirt or material left in ROW.
|
General Inspection | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Michael Zawacki
|
|
|
All work complete, excavator still parked on lot. Sent message with RP to see if they are done.
|
Site Preparation | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Michael Zawacki
|
|
|
Staging is off of troutner.Some trenching along troutner, work is headed up table rock. Table rock iscurrently excavated with material stored on street. Vac truck is on site, drain inlets ' protected.
|