Site Final | 11/27/2019 | 11/29/2019 | 12/3/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Final | 11/12/2019 | 11/12/2019 | 11/13/2019 | P | NR |
Michael Zawacki
|
|
|
Inlet protection still installed on Winsome, message sent to rp to remove.
|
General Inspection | 11/11/2019 | 11/11/2019 | 11/12/2019 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | NR |
Andy J. Long
|
|
|
need to pull storm drain sediment bags downhill from site
|
General Inspection | 10/24/2019 | 10/24/2019 | 10/24/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | | PART |
Andy J. Long
|
|
|
WIP on finishing home. Yard is landscaped. There is disturbed area around the perimter of the yard, needs to be stabilized and have down gradient sediment control.
Correction request - sweep up gutter and parking areas in front of home - provide plan for ESC controls on the disturbed areas outside of the landscaping. - pick up loose trash around perimeter. - schedule site final inspection.
No trackout or discharges
|
General Inspection | 9/20/2019 | 9/24/2019 | 9/25/2019 | P | PASS |
Michael Zawacki
|
|
|
Landscapers on site, some gravel on road.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | | PASS |
Michael Zawacki
|
|
|
Rockwork landscaping finished, no final stabilization installed. Wattle along lower perimeter. Street and sidewalk clean.
|
General Inspection | 8/15/2019 | 8/15/2019 | 8/15/2019 | | PART |
Michael Zawacki
|
|
|
Landscapers getting site prepped, no coverage right now. Sidewalk has been swept but is still dirty.
|
BMP Violation | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Michael Zawacki
|
|
|
Sidewalk swept and new perimeter wattles installed.
|
General Inspection | 7/17/2019 | 7/17/2019 | 7/19/2019 | | PART |
Michael Zawacki
|
|
|
Landscapers on site, lots of dirt on sidewalk during work. Trash box is overflowing and needs to be cleaned. Message sent to RP.
|
General Inspection | 6/27/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Lower perimeter has wattle. Street being swept at entrance.
|
General Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Andy J. Long
|
|
|
Final grading and landscaping in progress. No trackout or discharges
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PART |
Michael Zawacki
|
|
|
Silt fence uphill and behind home site needs to be repaired or removed, fence along sidewalk needs repairs. Building material starting to pile up behind and put pressure on fence. Message sent to RP.
|
General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Michael Zawacki
|
|
|
Crew on site removing forms from foundation. One trailer parked half off rock entrance and will probably track out.
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Michael Zawacki
|
|
|
Worker on site placing backfill, will be working on rock wall. No dirt leaving site. Port o potty has been tipped over.
|
General Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PART |
Michael Zawacki
|
|
|
Foundation in place, concrete washout is full. Some dirt on sidewalk and gutter, sent message to RP.
|
General Inspection | 10/17/2018 | 10/25/2018 | 10/26/2018 | P | PASS |
Michael Zawacki
|
|
|
Foundation excavated. Wattles along front, silt fence on side, rock entrance installed. Broom and shovel on site, sidewalk and street swept.
|
Site Preparation | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Andy J. Long
|
|
|
Site preparation. Note:silt fence located a rear of property is being used for property delineation only.
Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
Perimeter wattles installed properly. Temporary construction entrance installed, will be re-work after excavation. Receiving inlets have sediment protection. Permit sign posted. RP on duty.
Approved for construction. Follow up scheduled to check on excavation.
|