Permit Information
Permit NumberESC18-01178
StatusFinaled
Name JAMES LARKIN
Site Address 3088 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions. New foothills zone SFH. ESC site map and narrative approved. BMPs include stabilized construction entrance/off-street staging area, perimeter sediment control wattle along the sidwalk frontage and anywhere stormwater may flow off site. ESC site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/27/201911/29/201912/3/2019PPASS
DetailsMichael Zawacki
General Inspection11/27/201911/27/201911/27/2019 CANC
DetailsAndy J. Long
rescheduled for site final
Site Final11/12/201911/12/201911/13/2019PNR
DetailsMichael Zawacki
Inlet protection still installed on Winsome, message sent to rp to remove.
General Inspection11/11/201911/11/201911/12/2019 CANC
DetailsAndy J. Long
Site Final10/24/201910/25/201910/25/2019PNR
DetailsAndy J. Long
need to pull storm drain sediment bags downhill from site
General Inspection10/24/201910/24/201910/24/2019 CANC
DetailsAndy J. Long
General Inspection10/9/201910/9/201910/9/2019 PART
DetailsAndy J. Long
WIP on finishing home. Yard is landscaped. There is disturbed area around the perimter of the yard, needs to be stabilized and have down gradient sediment control.

Correction request
- sweep up gutter and parking areas in front of home
- provide plan for ESC controls on the disturbed areas outside of the landscaping.
- pick up loose trash around perimeter.
- schedule site final inspection.

No trackout or discharges
General Inspection9/20/20199/24/20199/25/2019PPASS
DetailsMichael Zawacki
Landscapers on site, some gravel on road.
General Inspection9/19/20199/19/20199/20/2019 CANC
DetailsAndy J. Long
General Inspection8/30/20198/30/20198/30/2019 PASS
DetailsMichael Zawacki
Rockwork landscaping finished, no final stabilization installed. Wattle along lower perimeter. Street and sidewalk clean.
General Inspection8/15/20198/15/20198/15/2019 PART
DetailsMichael Zawacki
Landscapers getting site prepped, no coverage right now. Sidewalk has been swept but is still dirty.
BMP Violation7/25/20197/25/20197/25/2019PPASS
DetailsMichael Zawacki
Sidewalk swept and new perimeter wattles installed.
General Inspection7/17/20197/17/20197/19/2019 PART
DetailsMichael Zawacki
Landscapers on site, lots of dirt on sidewalk during work.
Trash box is overflowing and needs to be cleaned.
Message sent to RP.
General Inspection6/27/20197/2/20197/2/2019PPASS
DetailsMichael Zawacki
WIP on framing. Lower perimeter has wattle. Street being swept at entrance.
General Inspection6/27/20196/27/20196/27/2019PPASS
DetailsAndy J. Long
Final grading and landscaping in progress. No trackout or discharges
General Inspection4/2/20194/2/20194/2/2019PPART
DetailsMichael Zawacki
Silt fence uphill and behind home site needs to be repaired or removed, fence along sidewalk needs repairs. Building material starting to pile up behind and put pressure on fence.
Message sent to RP.
General Inspection2/4/20192/4/20192/4/2019PPASS
DetailsMichael Zawacki
Crew on site removing forms from foundation. One trailer parked half off rock entrance and will probably track out.
General Inspection1/2/20191/2/20191/2/2019PPART
DetailsMichael Zawacki
Worker on site placing backfill, will be working on rock wall. No dirt leaving site.
Port o potty has been tipped over.
General Inspection12/14/201812/14/201812/14/2018PPART
DetailsMichael Zawacki
Foundation in place, concrete washout is full.
Some dirt on sidewalk and gutter, sent message to RP.
General Inspection10/17/201810/25/201810/26/2018PPASS
DetailsMichael Zawacki
Foundation excavated. Wattles along front, silt fence on side, rock entrance installed. Broom and shovel on site, sidewalk and street swept.
Site Preparation10/17/201810/17/201810/17/2018PPASS
DetailsAndy J. Long
Site preparation. Note:silt fence located a rear of property is being used for property delineation only.

Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin

Perimeter wattles installed properly. Temporary construction entrance installed, will be re-work after excavation. Receiving inlets have sediment protection. Permit sign posted. RP on duty.

Approved for construction. Follow up scheduled to check on excavation.