DOC - Permit Finaled | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Conference | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | FAIL |
Andy J. Long
|
|
|
3rd correction request and failed inspection.
Corrections needed: - sweep all loose dirt off sidewalk, gutter, and street - pick up any loose trash around site that can be blown away - install sediment protection filter bag on Cassia, west of site across Hilton - repost ESC permit signs in front of each project on a sign board. - site must be equipped with push broom for daily sweep up by RP and/or subcontractors.
If all corrections are not complete Monday 3/25 re-inspection fees and pacel holds will be applied to all projects
|
General Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of boot trackout onto sidewalk and street. Needs to be swept.
|
General Inspection | 2/7/2019 | 2/13/2019 | 2/19/2019 | P | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 2/4/2019 | 2/6/2019 | 2/7/2019 | A | FAIL |
Andy J. Long
|
|
|
No new violations. Concrete washout dumped on ground in Hilton still not cleaned up
|
BMP Violation | 2/1/2019 | 2/1/2019 | 2/4/2019 | P | PEND |
Andy J. Long
|
|
|
|
BMP Violation | 1/29/2019 | 1/30/2019 | 2/1/2019 | P | FAIL |
Andy J. Long
|
|
|
No corrections made. Pictures sent to RP. Stated he thought it was washout on Cassia.
Clean up is need on Hilton lots...
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | FAIL |
Michael Zawacki
|
|
|
No concrete washout, trucks were cleaning into unlined hole. Trackout from concrete trucks.
|