Site Final | 5/6/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Andy J. Long
|
|
|
Disturbed areas stabilized. No temporary BMPs left on surrounding streets. No ESC requests. All permits finaled.
|
General Inspection | 5/5/2020 | 5/5/2020 | 5/6/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Final | 3/20/2020 | 3/20/2020 | 3/23/2020 | P | NR |
Andy J. Long
|
|
|
Some construction activity and staging ongoing. No trackout leaving site.
|
General Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 2/3/2020 | 2/3/2020 | 2/3/2020 | | PASS |
Michael Zawacki
|
|
|
Most of storage completed. Area between storage and jacked fitness still bare. Silt fence is still installed around canal.
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | | PASS |
Michael Zawacki
|
|
|
Within site is all paved. All concrete work is completed. Current work is erecting steel storage buildings. No blowing trash or trackout.
|
General Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. No trackout, no fugitive dust, no discharges observed.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Michael Zawacki
|
|
|
Multiple stages of work from steel framing to setting forms. Area has been filled an elevation icreased. Steep slope leading to silt fence around canal, berm left at bottom on west side near storage lot next door. kers parked on pavement. No loose trash or trackout, no issues.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Fill has been brought in and elevation increased. Silt fence still along perimeter. Washout installed. WIP on a few of the building pads.
|