Site Final | 3/27/2020 | 3/30/2020 | 3/31/2020 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/27/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | PASS |
Michael Zawacki
|
|
|
Home completed and occupied. Still needs landscaping, silt fence still in place.
|
General Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | | PASS |
Michael Zawacki
|
|
|
House is completed, no landscaping. Spoke with PJ a few weeks ago and he planned on getting a revegetation bond.
|
General Inspection | 2/10/2020 | 2/10/2020 | 2/11/2020 | | PASS |
Andy J. Long
|
|
|
Work occuring on interior. No trackout, spills, discharges around site. Workers parking on street.
|
General Inspection | 1/24/2020 | 1/24/2020 | 1/27/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior completed, driveway poured. Perimeter fence still installed, nothing has left site.
|
General Inspection | 1/9/2020 | 1/9/2020 | 1/9/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior looks completed, no gutters on house yet. No issues.
|
General Inspection | 12/25/2019 | 12/25/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2019 | 12/10/2019 | 12/10/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway poured, no dumped washout. Site is contained. Trash starting to get full, workers have bad aim.
|
Random Inspection | 11/21/2019 | 11/25/2019 | 11/26/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/19/2019 | 11/19/2019 | 11/21/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/4/2019 | 11/4/2019 | 11/4/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Trash is starting to fill up, rest of site is clean.
|
General Inspection | 6/14/2019 | 6/20/2019 | 6/25/2019 | A | PASS |
Andy J. Long
|
|
|
|