Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberESC19-00187
StatusIssued
Name TRAVIS BLACKBURN
Site Address 12000 W FAIRVIEW AVE
Project NameVillage East
Customer Number 
ePlanReviewNo
Description
Building H: The project consists of the new construction of a 272 multi-family apartment complex located on approximately 11.2 acres in the Boise Idaho. Development includes 272 dwelling units in ten buildings ranging from two to four stories, seven detached garage structures, two accessory buildings, and a clubhouse building with community pool, along with associated landscaping and site improvements. Main building area is approximately 310,000 square foot consisting of (30) 1-bedroom/1-bath junior units, (64) 1-bedroom/1-bath units, (12) 2-bedroom/1-bath units, (94) 2-bedroom/2-bath units, (16) 2-bedroom/2-1/2-bath townhouse units and (56) 3-bedroom/2-bath units, clubhouse, community and maintenance buildings.see ESC19-00181 for details
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/10/20207/10/20207/10/2020 PASS
DetailsMichael Zawacki
WIP on multiple buildings. Teneants are expected to move into a few buildings end of the month.
Site is clean, areas are being watered to keep dust down, sweeper comes twice a week.
General Inspection5/25/20205/25/20205/26/2020 CANC
DetailsAndy J. Long
General Inspection4/7/20204/7/20204/7/2020 CANC
DetailsAndy J. Long
see ESC19-00181 & ESC19-00839
General Inspection2/19/20202/19/20202/19/2020 PASS
DetailsAndy J. Long
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
General Inspection1/2/20201/2/20201/2/2020 CANC
DetailsAndy J. Long
see ESC19-00181
Site Preparation1/2/20201/2/20201/2/2020PCANC
DetailsAndy J. Long
General Inspection11/14/201911/14/201911/14/2019 PASS
DetailsAndy J. Long
see ESC19-00181 for Village East inspection notes and correction requests