General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Michael Zawacki
|
|
|
OK to final when witches hat pulled from drain at columbus.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior completed and site landscaped. No ESC issues.
|
General Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PART |
Michael Zawacki
|
|
|
Some backfill spilling onto sidewalk. Message and picture sent to RP.
|
BMP Violation | 4/17/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. RP installed sediment protection and cleaned up gutter on Spaulding.
Concrete pump truck at site at time of inspection. NW pumping services has been directed to washout offsite at Sunroc yard.
|
BMP Violation | 4/15/2019 | 4/16/2019 | 4/17/2019 | P | PEND |
Andy J. Long
|
|
|
RP called to notify he will work on corrections and install sediment protection on drain after cleaining out the inlet sump. Follow up scheduled
|
BMP Violation | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed: - clean out mud from receiving storm drain sump - clean gutters on Spaulding and Columbus - install sediment protection on stromdrain - place porta-pot on level ground and stake down - install concrete washout asap before foundations.
VM left with RP Bobby with with Wood River
|