General Inspection | 8/4/2020 | 8/4/2020 | 8/4/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on 3rd deck of parking garage, will start framing once deck completed, garage will not be open during construction. Site is clean and contained, no isses.
|
General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Andy J. Long
|
|
|
NO trackout, no debris aroud perimeter. Using concrete washout containment. Site is in compliance.
|
General Inspection | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Still working on parking decks.
|
General Inspection | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Andy J. Long
|
|
|
No trackout, dishcharges or spills. Ecopan washouts on site, storm drains around site have sediment protection
|
General Inspection | 4/14/2020 | 4/14/2020 | 4/14/2020 | | PASS |
Michael Zawacki
|
|
|
4th street closed. Site is clean and contained. Multiple washout on site. Working on vertical, looks like they are getting prepped to start next level. No issues at site, nothing leaving perimeter.
|
General Inspection | 2/28/2020 | 2/28/2020 | 3/2/2020 | | PASS |
Andy J. Long
|
|
|
BMPs installed. 4th street staging area with no spills or significant sediment accumulation. No trackout. Receiving storm drains have sediment protection installed. Using concrete washout pans, located in non-muddy area. Permit sign posted. ESC trained people onsite.
Corrrection request to maintain/switch out storm drain bag on the SW corner of project on Myrtle. Filled with sand and some cigarette butts.
|
General Inspection | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on fountation and podium walls. Ecopan washouts on site, paved loading and access lane is clean.No trackout or discharges.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted on across street on 4th (411 S 4th) where project HQ is located. Receiving storm drains on Myrtle have inlet protection. Using lane closure on 4th as stabilized access for material unloading and haul-off
Request to push dirt of curb on 4th and have routine cleaning of gutter. Washout on site are near full so will need to be replaced/serviced
|