General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PASS |
Michael Zawacki
|
|
|
Home completed. Topsoil spread, pallet of sod in driveway, landscape rocks stored on road.
|
General Inspection | 3/30/2020 | 3/30/2020 | 3/30/2020 | | PART |
Michael Zawacki
|
|
|
Message sent to RP. Topsoil is partially on sidewalk.
|
General Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Michael Zawacki
|
|
|
Home completed, not landscaped. Still needs some flat work around pool. Gutters drain overland, not connected to any system.
|
General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Andy J. Long
|
|
|
Permit posted, no trackout or dirt leaving site, trash contained. Crew getting ready for pouring driveway. Concrete washout will need to be contained or done offsite.
|
General Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured, washout on site and used. Building materials on site, no workers.
|
Complaint Inspection | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Michael Zawacki
|
|
|
Concrete crew working, washout used. No ESC issues at site. Fill has been placed in rear to level and grade backyard. Met RP at site, plans on hauling backfill.
|
Site Preparation | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Michael Zawacki
|
|
|
Met RP at site, no esc issues, no dust. Washout and permit on site. Will watch for dust and tracking.
|