Site Final | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/8/2020 | 4/8/2020 | 4/8/2020 | | PASS |
Michael Zawacki
|
|
|
Building exterior completed. Workers shooting grade for compaction in parking lot. Landscapers on site. Lot across street is being used for staging and storage. Inlets are protected, no tracking.
|
General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Work area is below grade. Staging and washout is located across street. Road is swept, some dirt on aprons. No loose trash.
|
General Inspection | 1/2/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Michael Zawacki
|
|
|
Masons working on exterior. Multiple washouts at site. Using lot across street as staging and storage. Streets are being swept, no esc issues at time of inspection.
|
General Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Andy J. Long
|
|
|
WIP. No significant trackout. Permit posted. Workers parking on paved parking lot across the street. No corrections at this time.
|
Site Preparation | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Work began without site prep inspection. Permit displayed on job trailer, trailer was locked, did not talk to foreman. Crew working on excavation for footings, water truck on site, guy spraying hose. No one parked in work area. Paving parking lots across street, not related to project but in very close proximity.
|