|
Completed initial project walkthrough. Items noted include; adjust notification at locations marked on plans at the 3rd, 2nd and 1st floors, (cd settings, spacing, height AFF), provide WP device at a 2nd floor bathroom, relocate a/v at the 2nd floor TV room, provide SD at the 2nd floor NAC, monitor sprinkler tamper at the 1st floor elevator control, relocate a/v at the kitchen exit access, post signage at the door to the FACP room, provide lock at circut breaker, post points map per review comments, provide documents cabinet. Provide plan modification for resubmittal to reflect field changes such as deleted ID's, door mag relays, elevator hat, changed room uses, added 1st floor vestibule, new ceiling mount devices in place of wall mount, - include IP DACT in place of phone lines. Remove all non-functional devices and system components from the previous panel including MP, SD, HD, power supplies, etc. prior to final.
|