INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection complete.
|
INSP-Final Inspection | 7/26/2019 | 7/29/2019 | 7/29/2019 | P | FAIL |
Jim Page
|
|
|
Fire sprinkler head needs to be added corridor next to glass doors.
Cleve Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | FAIL |
Jim Page
|
|
|
Sprinklers need adjusted so the escutcheons fit tight against ceiling. Fire sprinkler heads need to be added in little entry to room behind kitchen with sliding glass doors as well as corridor next to glass doors.
Phone #: ###-#### Inspection requested via web by Todd Walter
|
FIR-Aging Inspection | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | FAIL |
Troy Cobbley
|
|
|
Rings have been provided around the pendant heads which need approval from the manufacture. Need warning signs at the riser as per the approved plans. Flow switch functioned and rang the outside alarm bell.
Todd Phone #: ###-####
|
INSP-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | CANC |
Troy Cobbley
|
|
|
Todd wants to reschedule for tomorrow when he has fittings to set off the flow switch.Todd Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Jim Page
|
|
|
Tenting inspection request scheduled for th wrong day, this reuqest is cancelled per conversation with installing contractor on job site.
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping/pendant heads complete, areas where piping is between conditioned spaces approved for cover, areas where piping is in attic spaces and requires tenting not approved for cover. Tenting needs to be installed and inspected before cover is approved.
|