Permit Information
Permit NumberFIR18-00119
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 124 W SKYLARK DR
Project Name124 Skylark
Customer Number 
ePlanReviewYes
Description
[124 Skylark]
The fire sprinkler scope of work consists of a three level single family dwelling protected with a NFPA 13D system. New 2” polypipe will supply the system. The sprinklers are spaced at a maximum of 18’x18’ spacing.
[BLD16-02439]
WUI Zone A; **Special inspections required, see form #310** Permit for the construction of a new 4,125 sq. ft., one full story above grade with two levels of daylight basement (upper level 1,237 sq. ft., middle level 1,906 sq. ft., lowest level 982 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 511 sq. ft. of covered patio and a 480 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1B zoning and setbacks per planning. //leg **REVISED GEOTECHNCIAL ENGINEERING REPORT REQUIRED BEFORE ANY SUBGRADE INSPECTION IS APPROVED**** JCT***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.

Alternative Materials and Methods:

• There are no AMM at this time
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/28/20198/29/20198/29/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Contact Ken Orahood ###-#### 30 min prior to Final Insp. start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush7/30/20197/31/20197/31/2019ADONE
DetailsJim Page
Undergorund main line flush completed after piping repair was made. Repair observed, undergournd approved for cover.

Contact Ken Orahood ###-####30 min prior to Flush Insp start please. Ken would like to do this at 9:30 AM if possible.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush7/29/20197/30/20197/30/2019AFAIL
DetailsJim Page
Main line flush was not cooridnated with SUEZ for valve operation, flush will need to be rescheduled and cooridnated with SUEZ.

Contact Aaron Trimble ###-#### 30 min prior to Flush Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Conference7/15/20197/15/20197/15/2019PDONE
DetailsJim Page
Fire conference complete.

Contact Aaron Trimble ###-#### 30 min prior to Insp Consult start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection6/24/20196/24/20196/24/2019PFAIL
DetailsJim Page
Relocate head in master closet as discussed. Pressure relief hose kept coming loose during flow test, still need to accomplish flow test. Raise head in closet next to mech room as discussed.

Contact Ken Orahood ###-#### Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush8/21/20188/22/20188/22/2018ADONE
DetailsJim Page
Underground main line flush complete.

Contact Leroy Anderson ###-#### Flush has been scheduled with Stacy Stuart at SUEZ all have confirmed a 9 am Start.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in8/16/20188/17/20188/17/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.

Contact Brad Westbrook ###-#### - 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in8/8/20188/9/20188/9/2018AFAIL
DetailsJim Page
Drawings on site are not city approved drawings, could not find the city stap. Head in main entry is blocked, head needs relocated. Add head under mid level stairs. Numerous heads throughout are overspaced, as stated in permit description max spacing is 18ft by 18ft. Re-route piping that is bent around HVAC flex-duct located in basement level.

Contact Brad Westbrook ###-#### 30 min before RTC Start please, if voice mailbox is full please contact Leroy Anderson ###-#### please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro7/31/20188/2/20188/2/2018PCANC
DetailsJim Page
Attempted to call point of contact provided 2 times, could not leave a message because voicemail was full, this request is cancelled and a new inspection will need to be requested.

Contact Brad Westbrook - ###-#### 30 min prior to RTC insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/12/20187/13/20187/13/2018APASS
DetailsJim Page
Undergorund piping has been changed to CPVC, undergorund supply approved for cover.

Contact Brad Westbrook ###-#### 30 min prior to UG RTC Insp Start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in7/6/20187/6/20187/6/2018PFAIL
DetailsTroy Cobbley
Per the plumbing inspector the underground piping being used is not listed. LIsted piping needs to be installed and re-inspected.


Contact Brad Westbrook - ###-#### 30 min prior to UG RTC Start please, hew would prefer to schedule this inspection for 2pm today.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Conference7/3/20187/3/20187/3/2018PDONE
DetailsJim Page
Fire conference complete for undeground supply.
INSP-Sprinkler Rough-in7/2/20187/3/20187/3/2018PCANC
DetailsJim Page
Request was for a conference on the underground, this request is cancelled.

Contact Brad Westbrook - ###-#### 30 Min prior to Insp. start, Brad needs this to be after 1PM if at all possible please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank