INSP-Final Inspection | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Marcus Smith is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | FAIL |
Jim Page
|
|
|
Replace sprinkler on riser with a quick response head. Flow switch did no operate correctly during water flow.
Markus Smith is the contact for this fire final inspection. He is hoping for and AM appointment. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 12/11/2018 | 12/12/2018 | 12/12/2018 | P | PART |
Jim Page
|
|
|
Partial final inspection for overhead fire sprinkler piping complete, plumbers still need to hook water closet to fire sprinkler system as shown on the city approved drawings. Flow test will be completed during next inspection.
Colton Cox is the Contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at static pressure, no pressure loss observed at riser provided gauge.
|
INSP-Sprinkler Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|