Permit NumberFIR18-00153
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 182 E SHERMAN ST
Project NameFULLMER RESIDENCE
Customer Number 
ePlanReviewYes
Description
[Fullmer Residence]
The fire sprinkler scope of work consists of installing 2" polypipe underground (combination main) to a 3458 ft² NFPA 13D residence utilizing a passive purge system. The riser will be 1½" sch. 40 steel pipe with a 1½" backflow preventer and riser manifold. The residence will have 34 sprinklers with CPVC piping used throughout. (Sprinklers are required per document in CFH17-00072 from the Fire Department.)

[BLD18-00592]
Permit for the construction of a new 3458 sq. ft., two story (first story 3120 sq. ft., second story 338 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 3458 sq. ft. of covered patio/porch and a ??969?? sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning.

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/13/201812/14/201812/14/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Marcus Smith is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection12/12/201812/13/201812/13/2018AFAIL
DetailsJim Page
Replace sprinkler on riser with a quick response head. Flow switch did no operate correctly during water flow.

Markus Smith is the contact for this fire final inspection. He is hoping for and AM appointment. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection12/11/201812/12/201812/12/2018PPART
DetailsJim Page
Partial final inspection for overhead fire sprinkler piping complete, plumbers still need to hook water closet to fire sprinkler system as shown on the city approved drawings. Flow test will be completed during next inspection.

Colton Cox is the Contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro8/16/20188/16/20188/16/2018APASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed at static pressure, no pressure loss observed at riser provided gauge.
INSP-Sprinkler Rough-in8/15/20188/16/20188/16/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.