INSP-Final Inspection | 11/13/2018 | 11/14/2018 | 11/15/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Final Inspection | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Troy Cobbley
|
|
|
Remaining piping rough-in for the northwest corner of the system where the ELO heads are located passed. Overhead hydro passed. I discussed the need for a forward flush test and permanant devices installed for this test.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2018 | 8/24/2018 | 8/24/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for newly installed CPVC overhead fire sprinkler piping witnessed, no pressure loss observed at contractor provided gauge.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for CPVC piping complete, CPVC piping approved for cover. Hydrostatic test to be completed at a later date.