INSP-Final Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
POC is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping above the lay-in ceiling that is ok for cover. One pendant needs to be added at the column as marked on the plans.
Rough to cover inspection for the servery area of this project. Foreman on job is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2019 | 1/14/2019 | 1/11/2019 | P | CANC |
Jim Page
|
|
|
Hydro test to be perfromed same time as permit FIR18-00382. POC is Zack Grasmick Phone #: ###-#### >> Inspection requested via web by Brett Lawatch Inspection cancelled from web by: Brett Lawatch
|
INSP-Sprinkler Rough-in | 11/14/2018 | 11/15/2018 | 11/15/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above grid in area of work complete, approved for cover.
Rough in inspection of 2nd half of Kitchen/Server area. Zack Grasmick is foreman on job. Phone #: ###-#### Inspection requested via web by Brett Lawatch
|
INSP-Sprinkler Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping marked "ok" that can be covered in the Kitchen area.
Rough to Cover inspection for Phase 2. Foreman is Zack Grasmick Phone #: ###-#### Inspection requested via web by Brett Lawatch
|