Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberFIR18-00684
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 199 N CAPITOL BLVD Unit: 200
Project NameAngstman -Johnson TI
Customer Number 
ePlanReviewYes
Description
[Angstman - Johnson TI] - Quick Permit
Suite 200- 75% of floor is being remodeled. Add and relocate 101 sprinklers. Some open ceilings w/perimeter walls/soffits full height. Cloud ceilings in open area. Existing sprinklers SR, new QR.

[BLD18-02557]
The fire sprinkler system is used for high-rise. Permit is to remodel an existing 10,807 sq. ft. tenant space within the 2nd floor of the existing building. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select plumbing fixtures, removal of select millwork, removal of select suspended acoustic ceiling, removal of select ceiling soffit, removal of select light fixtures, construction of select new walls to make offices, a storage closet, an accessible shower room, a locker room, (3) open lounge areas, open office areas, a copy room, halls, a break room, a kitchenette, (4) conference rooms, a reception/waiting area, a war room and (2) accessible restrooms, new door/door frames, millwork, select new interior windows, new Hi/Lo drinking fountain, add 18” vertical grab bars in existing accessible restrooms, select ne suspended acoustic and gypsum ceilings, select ne light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the building’s Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 and NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/27/201812/28/201812/28/2018PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Plans are on site Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/10/201812/10/201812/10/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in11/26/201811/27/201811/27/2018PPART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.

Parcel cover north side of space. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in10/23/201810/24/201810/24/2018APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, notated the city approved drawings with yellow highlighter areas approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball