Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberFIR18-00828
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2015 S HUDSON AVE
Project NameSkyline Apartments Bldg E
Customer Number 
ePlanReviewYes
Description
[Skyline Apartments Building E]
The fire sprinkler scope of work consists of installing a new fire sprinkler system into a new three-level apartment building per NFPA 13R, 2016, and the City of Boise. The system has floor control valves, residential sprinklers and CPVC piping.

• The underground piping is under permit FIR18-00583

[BLD17-04627]
Building E: (SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 units) PLAN MOD RELOCATE WASHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three-story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1-hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192-unit apartment project with (9) apartment buildings, clubhouse, and associated site work

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/31/20198/1/20198/1/2019PPASS
DetailsTroy Cobbley
Permit finaled. 2nd and 3rd floor flow switches have been repaired.

Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection7/29/20197/31/20197/31/2019AFAIL
DetailsJim Page
Flow switches for levels 2 and 3 did not operate correctly during flow test.

Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection7/24/20197/30/20197/29/2019ACANC
DetailsJim Page
Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in3/6/20193/7/20193/7/2019APASS
DetailsJim Page
All tenting in place at time of inspection, level 3 approved for cover.

Gabe Garduno is the contact for this RTC inspection for building E. He is requesting the inspection for the 3rd floor. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/5/20193/6/20193/6/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on level 3 witnessed, no pressure loss observed.

This is for a hydro only inspection. Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/5/20193/5/20193/5/2019AFAIL
DetailsJim Page
Level 3 is not approved for cover, tenting has been removed in numerous areas, needs to be corrected before cover is approved.
INSP-Sprinkler Rough-in3/5/20193/5/20193/5/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on levels 1 and 2 complete, levels 1 and 2 approved for cover.
INSP-Sprinkler Rough-in/Hydro3/4/20193/5/20193/5/2019APART
DetailsJim Page
Hydrostatic test for level 1 and 2 witnessed, no pressure loss observed.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/15/20192/19/20192/19/2019AFAIL
DetailsJim Page
Install does not match city approved drawings. Adjust hangers in areas that are overspaced.

Gerardo Arce is the contact. Thank you for your help! Phone #: ###-#### Inspection requested via web by Stan Beus