INSP-Final Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final fire sprinkler inspection complete. Fire sprinkler system is a shared system with the domestic, the lawn sprinklers is pressurized irrigation, not domestic treated water, irrigation shut-down on flow switch not required for this application.
all fixes are done thank you. Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | FAIL |
Jim Page
|
|
|
Provide 911 sign for fire bell. Sprinkler head in entry is to close to crown molding, need a minimum of 4 inches to be code compliant. Need to raise head in bedroom that is hanging down below ceiling.
please give a heads up thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in/Hydro | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Piping can be covered. Rough-in passed. Tenting passed. Jeremiah removed some insulation on the several vertical pipe runs so that heat would transfer to the pipe. Insulation was still on the back side. Phone #: ###-#### Inspection requested via web by jeremiah robison
|