INSP-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Rick Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Jon O Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | FAIL |
Troy Cobbley
|
|
|
Per the city approved plans the front area is considered an "M" occupancy and will need the pendant heads spaced for ordinary hazard not light hazard. Adam Phone #: ###-####
|