Permit NumberFIR19-00252
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 100 S 6TH ST
Project NameChina Blue Sprinkler reinstall
Customer Number 
ePlanReviewYes
Description
***QUICK PERMIT**MAS** The Roof is being repaired and the sprinkler system where the roof repair is occurring will be demo'ed out and capped back outside of the repair area. The rest of existing system will still be active during the repair of the roof so that the building is protected. Once the roof repair is complete the system will be reinstalled per the original design drawings. There will be no changes to the original design.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/16/20197/17/20197/17/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for scope of work complete.

Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in6/18/20196/18/20196/18/2019PPASS
DetailsJim Page
Rough in inspection for new overhead fire sprinkler piping below new hardlid in area of work complete. Insulation has been moved to above sprinkler piping in attic space.

chris Phone #: ###-####
INSP-Sprinkler Rough-in5/22/20195/22/20195/22/2019PFAIL
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in attic space where piping was removed and installed due to roof collapse complete. Insulation is shown to be installed on the bottom cords of the trusses, piping will not be protected from freezing with this application. Freeze protection will need to be provided for fire sprinkler piping in attic space or submit heat calculations from a professional engineer showing that the attic space will be maintained at a minimum of 40 degrees fahrenheit to be compliant with 2016 NFPA 13, section 8.16.4.

###-#### clarence